Currently, the expansion of fixed assets of the enterprise is planned taking into account the introduction of new high -performance equipment, the organization of streaming methods of production and replacement of obsolete existing equipment with new.
Simultaneously with the preparation of the technical industry plan for the planned year, a draft capital construction plan is drawn up, and in cases where construction is completely independent, separately Stroyfinplan.