When using the method of semi -dry screed, heat is laid on the base — and the moisture insulating layer is fixed and it is fixed. Then the beacons are exhibited using the level. After the beacons are installed, the cement mixture is prepared and the laying is made. It is desirable to lay the mixture in small parts, during the laying process, the mixture must be aligned.







