But, probably, it will be more practical to do tiles first, then install the entire overall plumbing — bathroom, washbasin, toilet, finish the installation of pipes and only then you need to put the door box. Having installed it to these all the work, there is a risk of damage — scratches, chips or simply smear with an adhesive mixture for tiles or something else.







