If you purchased an apartment in a new house, then you need to level the floor. This can be done using a special self -leveling mixture. Before work, the base must be thoroughly cleaned, and then primed. After this, it is required to prepare a solution of the mixture according to the instructions attached to the packaging of building materials.







