According to this scheme, the installation of pipes, cranes and other equipment will occur.
The next step is one of the most important, and the functionality of the entire water supply system will depend on its implementation. This is the installation of the sewage system, and all the installation work should occur using a level or leveling, since it is necessary to create a natural slope for sewage drainage.







