In fact, since any material that is placed on the solution and has building seams, with an unreliable foundation (strip), as well as with the movements of soils, the load in the structure will be distributed incorrectly. Cracks may go because of this.
Therefore, as in the case of bricks and gas -winging blocks, each floor should be finished with a monolithic belt.