Foam blocks are laid on a cement pillow. Further, using the same cement mortar, the foundation is built to the desired level. Between each two or three rows, waist reinforcement from a grid or reinforcement is performed.
After erecting the foundation, waterproofing is carried out to prevent moisture from the lower levels, thereby preventing the saturation of foam block with moisture and its destruction.