1. The support pillars are erected at the corners of the building, at the intersections of the walls (internal and external), in the intervals between them, as well as under the loaded structures of the building.
2. The depth of the foundation is about two meters, while the upper ends of the pillars (heads) should be at the same height from the ground level (usually 40-50 cm).