Then the new plastic frame is installed in the opening, aligned and fixed with construction foam, which freezes about half an hour. After that, glasses are installed and all the cracks are sealed with sealant.
The finishing work begins after the departure of the builders, but it is much better to perform the external finish before the builders have gone while there are unhindered access to each part of the slope.