«Most are currently perceiving such a long -term legacy of the global crisis, but the» frozen «construction is, first of all, the result of managerial errors,» the interlocutor of the agency said.
He believes that usually the construction is on the spot due to numerous bureaucratic delays and approvals, for example, the finished object is not accepted, since the entrances need light bulbs on LEDs.