When using electric mixers, it is advisable to connect them to the sockets in the next room, and where a screed is made or a layer of plaster is placed, it is better to turn off the power supply of electricity at all. Perforators and drills should be used only with completely serviceable, preferably new, cutting, drilling and beating an insert tool.