In the production of concrete and reinforced concrete, about half of the costs (4850%) falls on raw materials and main materials (cement, aggregates, metal) and only about 30%on wages.
Grouping costs of production by economic elements makes it possible to determine the overall need of the enterprise for material funds and cash and is used to plan working capital.