Having completed all these works and making sure that the carpet around the entire perimeter is cut evenly, remove the upper layer of adhesive tape and proceed to work on installing skirting boards. Gradually apply the baseboard and fix them.
If the room is already installed in the room, then with the help of a screwdriver, carefully palm off the rivervrolin under them, trying not to damage the material.







