For this, as a rule, a concrete screed is used. After its complete drying, put the base for the flooring, and then the floor material itself, it can be a laminate, a massive walnut board or parquet. Before proceeding with the leveling of the walls, it is necessary to replace the wiring, since during such work there is damage to their surfaces, make new sockets and switches more convenient to use.