Secondly, after such preparation of the floor surface for staining, it will be necessary for a start for the first time, and preferably 2 layers, after which the floor must be well dried. And only after these procedures can you begin to direct flooring. Thus, observing the above recommendations, the painted floor will look much better, and the paint will last much longer.