For resuscitation, the campaign specialists will perform work such as: cleaning the well and bottom from sand, small gravel, silt, organics, removal of rust from the pipe or mesh of the filter.
These operations are performed using a hydrodynamic apparatus, an electro-hydroxypulse installation and air supply under high pressure for 6-8 hours and, according to a number of work, without arrival at the site.







